Crusher, mineral material crushing plant and method for handling a thrust bearing in a crusher

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10525476
APP PUB NO 20160325287A1
SERIAL NO

15110164

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crusher is disclosed having a rotatable eccentric, a main shaft supported to the eccentric, a piston for adjusting the vertical position of the main shaft and an axial thrust bearing between the lower end of the main shaft and the piston. The thrust bearing has an upper bearing attached to the lower end of the main shaft, a lower bearing attached to the piston, and a pressure plate between the upper bearing and the lower bearing. A circular groove or expansion is formed onto the pressure plate. A releasing member is attached to a crusher structure outside of the pressure plate. The releasing member has a circular lip directed to the direction of the pressure plate. Part of the lip is in the groove or above the part of the extension. The releasing member is attached to the piston.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METSO FINLAND OY02230 ESPOO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuvaja, Kari Tampere, FI 16 39
Lautala, Aki Tampere, FI 10 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00