Material substitution of cuprous chloride molten salt and oxygen gas in the thermolysis reactor of hydrogen production Cu—Cl cycle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10526201
APP PUB NO 20170015551A1
SERIAL NO

15210782

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the thermochemical water splitting process by the Cu—Cl cycle, oxygen gas is produced by a thermolysis process in a three-phase reactor. A precise knowledge of the hydrodynamic and heat transfer analyses is required for the scale-up of the thermolysis reactor. However, in the experimental studies of the scale up analysis, there are some challenges in using the actual materials of the thermolysis reactor products (i.e. molten salt CuCl and oxygen gas). In accordance with the teachings herein, alternative materials are defined, by using dimensional analyses, to simulate the hydrodynamic and heat transfer behaviors of the actual materials. It has been found that these alternative materials are liquid water at 22±2° C. and helium gas at 90±2° C. The alternative materials provide safe environment for the experimental runs as well as lower operating temperature. Furthermore, these alternative materials are more readily available and are low cost.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABDULRAHMAN MOHAMMED WASSEFOSHAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abdulrahman, Mohammed Wassef Oshawa, CA 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00