Modular building structure with integrated plants

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10526781
APP PUB NO 20190024365A1
SERIAL NO

16068780

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular building structure with relative integrated plants, as obtained by assembling a plurality of module frames to obtain a complex frame, allows associating ducts of one or more plants to the module frame. The module frames have a parallelepiped-like shape and are identified by beams joining in respective angles, including a plurality of connecting knots joining module frames adjacent to the angles; the adjacent beams of side-by-side module frames are spaced apart by the knots and the panels and are connected to the beams of the module frame thereto, so as to create an air gap. The integrated plants have a plurality of ducts arranged in the air gaps and in the through channels, which include, at edges or angles of the module frame, quick connections for connecting the ducts related to a module frame to those of another module frame placed side-by-side thereto.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EMMEALLAENNE S.R.L.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lestini, Federico Rome, IT 3 19
Pofi, Luca Rome, IT 3 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00