Optical modulator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10527874
APP PUB NO 20190113778A1
SERIAL NO

16090276

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical modulator is provided and includes a substrate that has an electro-optic effect, an optical waveguide that is formed on the substrate, a plurality of control electrodes that control a light wave propagated through the optical waveguide, and a plurality of light receiving elements that detect a light wave propagated through the optical waveguide. The optical modulator has two or more independent optical waveguide modulation portions. The light receiving elements are respectively provided in an upper part of the substrate with respect to the independent optical waveguide modulation portions. A wiring substrate is located above the substrate. A plurality of electric wirings are located on the wiring substrate. The plurality of electric wirings are disposed to extend in the vicinity of one side of the wiring substrate, are electrically connected to the light receiving elements, and output a signal detected by the light receiving elements to the outside.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO OSAKA CEMENT CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katou, Kei Tokyo, JP 27 235
Miyazaki, Norikazu Tokyo, JP 100 175

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00