Joint fountain coding and network coding for loss-tolerant information spreading

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10530526
APP PUB NO 20190028239A1
SERIAL NO

16137685

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A network system for increasing data throughput and decreasing transmission delay from a source node to a sink node via a relay node. The network system may comprise a source node configured to encode a plurality of data packets using rateless coding and transmit the plurality of data packets; at least one relay node configured to receive at least one of the plurality of data packets from the source node, and if the at least one relay node has received a sufficient quantity of the plurality of data packets, regenerate, re-encode, and relay the plurality of data packets; and a sink node configured to receive one or more of the plurality of data packets from the at least one relay node, and if the sink node has received the sufficient quantity of the plurality of data packets, regenerate and decode the plurality of data packets.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF FLORIDA RESEARCH FOUNDATION INCORPORATEDONE PROGRESS CENTER ALACHUA FL 32615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Qiuyuan Gainesville, US 4 10
Li, Xin Gainesville, US 946 7137
Sun, Kairan Gainesville, US 4 12
Wu, Dapeng Oliver Gainesville, US 19 263

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00