Grid independent operation control unit, power conditioner, and grid independent operation control method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10536000
APP PUB NO 20170288403A1
SERIAL NO

15321028

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grid independent operation control unit includes a load current estimator to estimate a load current supplied to stand-alone power system in accordance with an output current of the inverter and an output voltage, and a feedback controller configured to PWM control the inverter at a duty ratio feedback calculated to cause the inverter to output an output voltage command value in accordance with the output voltage and the load current. The feedback controller is configured to PWM control the inverter at a duty ratio feedback calculated for output of a normalized output voltage command value obtained by normalizing the output voltage command value with the DC bus voltage in accordance with normalized output voltage obtained by normalizing the output voltage with the DC bus voltage and normalized load current obtained by normalizing the load current with the DC bus voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TABUCHI ELECTRIC CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hidaka, Hideki Amagasaki, JP 11 61
Lung, Chienru Osaka, JP 9 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00