Modular LNG production facility

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10539361
APP PUB NO 20140053599A1
SERIAL NO

13686126

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A liquefied natural gas production facility and a method of designing and constructing a liquefied natural gas production facility are described. The facility includes space-apart modules for installation at a production location to form a production train including a major axis and a minor axis, each module including a module base for mounting a plurality of plant equipment associated with a selected function assigned to the module, the module base including a major axis and a minor axis. Heat exchangers are arranged to run parallel to the major axis of the production train to form a heat exchanger bank including a major axis and a minor axis, where the major axis of the bank is parallel to the major axis of the train. A subset of the plurality of heat exchangers is arranged on a first level vertically offset from the base of at least one module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WOODSIDE ENERGY TECHNOLOGIES PTY LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byfield, Geoffrey Brian Nedlands, AU 5 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00