Honeycomb structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10543446
APP PUB NO 20180207571A1
SERIAL NO

15854149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A honeycomb structure including prismatic columnar honeycomb segments and a bonding layer, wherein the bonding layer has rows in each of which bonding layer portions each disposed between two honeycomb segments arranged to face each other are arranged to extend from one point of a peripheral edge of a bonded body of the honeycomb segments to the other point thereof, in a cross section, the bonding layer of each of the-rows is disposed so that among the bonding layer portions arranged in one direction, an outermost circumference bonding layer portion and at least one of the other bonding layer portions are not superimposed on each other on an extension line of the one direction, and a ratio of shift of side surfaces of adjacent honeycomb segments to a length of one side of a side surface of honeycomb segments having the same cross-sectional shape is 10% or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NGK INSULATORS LTDNAGOYA-SHI AICHI 467-8530

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Yasushi Nagoya, JP 176 2401
Kondo, Takahiro Nagoya, JP 88 644

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00