Method and device for producing coated, and in particular painted, building boards and associated painted building board

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10544592
APP PUB NO 20160186440A1
SERIAL NO

14909818

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The subject matter of the present invention is a method for producing coated, and in particular painted, building boards (1), preferably for the interior finishing of buildings. First, the respective building board (1) is provided on its longitudinal edges (2) and/or transverse edges with a bevel (4). Then, the respective building board (1) is transferred to a rubber-like transporting belt (7) in such a way that the edges (2) respectively provided with the bevels (4) are arranged transversely in relation to the conveying direction (F) of the transporting belt (7) and the bevels (4) are arranged adjacent to a visible side (6) of the building board (1), facing away from the transporting belt (7). Finally, a coating material, and in particular paint (13), is applied to the visible side (6) of the building board (1) and respective bevel areas (5) of the bevels (4) in one operation with the aid of at least one roller (11) arranged above the transporting belt (7) and rotating substantially transversely in relation to the conveying direction (F).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KNAUF GIPS KG AM BAHNHOF 7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Florenske, Oliver Möhnesee, DE 2 13
Mittnacht, Sebastian Würzburg, DE 2 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00