Hydroelectric energy systems, and related components and methods

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10544775
APP PUB NO 20180298876A1
SERIAL NO

15767828

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydroelectric energy system includes a stator including a first plurality of electricity-generating elements. The system also includes a rotor including a second plurality of electricity-generating elements. The rotor is disposed radially outward of an outer circumferential surface of the stator and is configured to rotate around the stator about an axis of rotation. The rotor is a flexible belt structure having a variable thickness and extending along a portion of an axial length of the stator. The system further includes at least one hydrodynamic bearing mechanism configured to support the rotor relative to the stator during rotation of the rotor around the stator. The at least one hydrodynamic bearing mechanism includes a bearing surface made of wood or a composite material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OCEANA ENERGY COMPANY1785 MASSACHUSETTS AVENUE NW WASHINGTON DC 20036

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Power,, III Daniel E Pace, US 11 418

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00