Electric motor with stator having step-shaped stator teeth

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10547224
APP PUB NO 20150069878A1
SERIAL NO

14394776

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric motor is provided with a stator core (3) configured by laminating a required number of annular electromagnetic steel sheets (5) having a plurality of tooth portions (4) around each of which a coil winding is wound, on the inner periphery side, wherein circumferential widths (B) of the tooth portion (4) in the plurality of electromagnetic steel sheets (5) which are laminated on both end sides of the stator core (3) become gradually narrow coward the respective end portion sides, and the coil winding is directly wound around the tooth portion (4) in which shoulder portions (7) on doth sides in a circumferential direction of the tooth portion (4) which is formed by lamination of the electromagnetic steel sheets (5) are shoulder portions (7) which smoothly change so as to narrow in width in a stepwise fashion toward the respective end portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HEAVY INDUSTRIES THERMAL SYSTEMS, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asai, Masahiko Tokyo, JP 30 183
Hattori, Makoto Tokyo, JP 142 1155
Niwa, Kazuki Tokyo, JP 29 247

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00