Multiple beamline position isocenterless positively charged particle cancer therapy apparatus and method of use thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10549124
APP PUB NO 20180133519A1
SERIAL NO

15868925

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention comprises a method and apparatus for treating a tumor with protons using multiple beamline positions not having an isocenter, including the steps of: (1) delivering the protons from a synchrotron along a redirectable beam transport path to yield a plurality of incident vectors, each of the plurality of incident vectors directed toward the treatment room and (2) redirecting the protons traveling along each of the plurality of incident vectors, with an output nozzle, to the tumor, where a first vector, of the plurality of incident vectors, comprises a first direction intersecting the tumor and where a second vector, of the plurality of incident vectors, comprises a second direction passing by the tumor without entering the tumor. The step of redirecting directs the protons traveling along the first and second incident vectors, respectively, to a first and second path intersecting a front and the back of the tumor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROTOM INTERNATIONAL HOLDING CORPORATION610 PARKER SQUARE FLOWER MOUND TX 75028

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bennett, James P Birmingham, US 50 316
Lee, W Davis Newburyport, US 99 450
Reno, Jillian Beverly, US 22 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00