Mold, method for producing mold, anti-reflection film and method for producing anti-reflection film

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10549458
APP PUB NO 20170028591A1
SERIAL NO

15303049

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method of a mold includes the steps of: providing an aluminum base in the shape of a hollow cylinder which is made of a Al—Mg—Si based aluminum alloy, the aluminum base being mechanically mirror-finished; performing a frosting treatment on a surface of the aluminum base with an aqueous solution which contains a salt of hydrogen fluoride and ammonium; thereafter, forming an inorganic material layer on the surface of the aluminum base and forming an aluminum film on the inorganic material layer, thereby forming a mold base; and alternately repeating anodization and etching on a surface of the aluminum film of the mold base, thereby forming an inverted moth-eye structure which has a plurality of micro recessed portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHARP KABUSHIKI KAISHA22-22 NAGAIKE-CHO ABENO-KU OSAKA-SHI OSAKA 545-8522

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Minoura, Kiyoshi Sakai, JP 233 1329
Nakahara, Takahiro Sakai, JP 49 166
Yamada, Miho Sakai, JP 58 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00