Method for manufacturing telescopic shaft

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10550285
APP PUB NO 20160257850A1
SERIAL NO

15032468

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a telescopic shaft including a male shaft and a cylindrical female shaft slidably connected to each other in an axial direction, in which an outer circumferential surface of the male shaft or an inner circumferential surface of the female shaft is coated with a resin coating layer, includes a coating step, a broaching step, and a cooling step. In the coating step, a powder coating material is attached, by a fluid bed dip method, on the outer circumferential surface of the male shaft or the inner circumferential surface of the female shaft which is heated in advance and the resin coating layer is formed. In the broaching step, the resin coating layer is caused to be thin by broaching before cooling of the formed powder coating material is completed. In the cooling step, the thin resin coating layer is cooled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JTEKT CORPORATION1-1 ASAHI-MACHI KARIYA-SHI AICHI-KEN 448-8652

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishida, Tomoya Kashihara, JP 14 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00