Method for producing a coated metal strip having an improved appearance

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10550458
APP PUB NO 20180002798A1
SERIAL NO

15703930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for manufacturing a coated metal strip having a metallic corrosion protection coating is provided. The process includes passing a metal strip through a molten metal bath comprising from 2 to 8 wt % aluminum, 0 to 5 wt % magnesium, up to 0.3 wt % additional elements, and a balance including zinc and inevitable impurities, to yield a molten metal coated metal strip, wiping the molten metal coated metal strip with a nozzle spraying a gas on either side of the molten metal coated metal strip and cooling the coating in a controlled manner until the coating has completely solidified, to obtain the coated metal strip. A temperature of the molten metal bath is from 350 to 700° C., and the cooling is conducted at a rate less than 15° C./s between a temperature on leaving a unit where the wiping occurs and a start of solidification of the coating, and then at a rate greater than or equal to 15° C./s between a start and an end of solidification of the coating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ARCELORMITTAL COMMERCIAL RPS S.A.R.L.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diez, Luc Metz, FR 17 74
Mataigne, Jean-Michel Senlis, FR 28 114

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00