Transmission method using parity packets, transmitter and repeater

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10560224
APP PUB NO 20170180083A1
SERIAL NO

15447296

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a transmission method executed by a transmitting apparatus to transmit a content to a plurality of terminals. The content having transmission count information indicating a number of times the content is to be transmitted by the transmitting apparatus. The transmission method including a first transmission step of generating and transmitting a first transmission signal which transfers at least a first portion of a plurality of data packets including a plurality of content packets, storing data of the content therein, and a plurality of parity packets, generated from the content packets, and a second transmission step of, when the transmission count information of the content indicates a plurality of times, generating a second transmission signal including at least a second portion of the plurality of data packets, and transmitting the second transmission signal during a period which differs from a period during which the first transmission signal is transmitted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY CORPORATION OF AMERICATORRANCE CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Murakami, Yutaka Kanagawa, JP 844 7226

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00