Foam generating device for a high-pressure water gun

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10562049
APP PUB NO 20190105671A1
SERIAL NO

16213522

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A foam generating device for a high-pressure water gun has a supporting body (14) defining part of a conduit (2), which extends along an axis (3) and has a mixing chamber (7) communicating with a lower inlet, and subject, in use, to a vacuum to aspirate a liquid from said lower inlet; the device has a first sleeve (17) which is fitted around one end of the supporting body (14), is axially fixed, is rotatable and is provided with an end portion carrying a nozzle (40); such a nozzle (40) defines the outlet (5) of the conduit and is adjustable so as to vary the outgoing flow type between a fan-like jet and a solid stream jet; the device has, in addition, a second sleeve (44) which is coupled to the first sleeve (17) in a fixed axial position and in a rotatable manner and is provided with cams (49) to adjust the nozzle (40) in response to a rotation of the second sleeve (44) with respect to the first sleeve (41).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MTM HYDRO S R LVIA MOGLIA 33 CHERASCO 12062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carpanese, Claudio Rovolon, IT 13 92

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2023
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00