Finger joint with a bridging cover plate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10563360
APP PUB NO 20180209104A1
SERIAL NO

15875445

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A finger joint having a bridging cover plate, which enables a steel plate having a thickness much smaller than that of a conventional finger to be used and allows the vertical rotation of an upper bridge structure. The finger joint includes: a bridging cover plate installed on a first structure and supported to a second structure across a gap so as to support a load of a vehicle passing over the gap, and configured to allow relative movement between the first structure and the second structure in a direction in which the distance of the gap changes; a first finger unit connected to the bridging cover plate; and a second finger unit installed on the second structure so as to allow relative movement relative to the first finger unit in a direction in which the distance of the gap changes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
R J WATSON INC11035 WALDEN AVENUE ALDEN NY 14004
ESCORTS CO LTD7 TEHERAN-RO 7-GIL GANGNAM-GU SEOUL 06134

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek, Joon Ho Daejeon, KR 3 17
Bang, In Seok Incheon, KR 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00