Faucet mounting structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10563383
APP PUB NO 20190376264A1
SERIAL NO

16004453

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A faucet mounting structure includes a pipe connector and a fixing assembly in cooperation with the pipe connector. The fixing assembly includes an upper main body and a lower main body. A first inclined surface of the upper main body and a second inclined surfaces of the lower main body are pressed against each other or separated from each other, so that a press ring of the lower main body is compressed or returned for engaging with or disengaging from an external thread of the pipe connector to realize the quick assembly and disassembly of the pipe connector and the fixing assembly, and the quick assembly and disassembly of the faucet body is realized.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIAMEN EASO CO LTDTHE FIRST FLOOR OF NO 86-88 SUN BAN SOUTH ROAD (INDUSTRIAL AND TRADE CENTER FACTORY) JIMEI DISTRICT XIAMEN CITY FUJIAN PROVINCE 361000 XIAMEN CITY FUJIAN PROVINCE 361000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Ximin Xiamen, CN 19 58
Li, Zhen Xiamen, CN 370 1800
Lu, Haitao Xiamen, CN 28 79
Yang, Yuebin Xiamen, CN 7 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00