Deep junction electronic device and process for manufacturing thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10566189
APP PUB NO 20190214251A1
SERIAL NO

16305735

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a process for manufacturing a deep junction electronic device including steps of: b) Depositing a layer of non-monocrystalline semiconductor material on a plane surface of a substrate of a monocrystalline semiconductor material; c) Incorporating inactivated dopant elements prior to step b) into said substrate (1) and/or, respectively, during or after step b) into said layer, so as to form an inactivated doped layer; d) Exposing, an external surface of the layer formed at step b) to a laser thermal anneal beam, so as to melt said layer down to the substrate and so as to activate said dopant elements incorporated at step c); e) Stopping exposure to the laser beam so as to induce epi-like crystallization of the melted layer, so that said substrate and/or, respectively, an epi-like monocrystalline semiconductor material, comprises a layer of activated doped monocrystalline semiconductor material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LASER SYSTEMS & SOLUTIONS OF EUROPE (LASSE)

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mazzamuto, Fulvio Paris, FR 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00