Temperature controlled method to liquefy gas and a production plant using the method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10571187
APP PUB NO 20150107297A1
SERIAL NO

14386323

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for liquefying gas involving pre-treating the gas stream in a pre-treater to remove impurities, and then passing the gas stream through a first flow path of a first heat exchanger to lower a temperature of the gas stream. The gas stream is then passed through the gas expansion turbine to lower a pressure of the gas stream and further decrease the temperature of the gas stream. The gas stream is then passed into a primary separator to separate the gas stream into a liquid stream and a cold gas stream. The liquid stream is collected. Selected quantities of the cold gas stream are passed through a second flow path of the first heat exchanger whereby a heat exchange takes place to cool the gas stream flowing through the first flow path to maintain the temperature of the gas stream entering the gas expansion turbine at a temperature which promotes the production of liquids.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 1304338 ALBERTA LTD.; 1304342 ALBERTA LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lourenco, Jose Edmonton, CA 39 187
Millar, MacKenzie Edmonton, CA 35 159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00