Electrical conductors, electrically conductive structures, and electronic devices including the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10575370
APP PUB NO 20170094723A1
SERIAL NO

15275551

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical conductor including:

    a first conductive layer including a plurality of metal nanowires; anda second conductive layer disposed on a surface of the first conductive layer, wherein the second conductive layer includes a plurality of metal oxide nanosheets,wherein in the first conductive layer, a metal nanowire of the plurality of metal nanowires contacts at least two metal oxide nanosheets of the plurality of metal oxide nanosheets, andwherein the plurality of metal oxide nanosheets includes an electrical connection between contacting metal oxide nanosheets.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hwang, Jinyoung Yongin-si, KR 39 62
Hwang, Sungwoo Suwon-si, KR 56 331
Jung, Doh Won Seoul, KR 37 55
Kim, Se Yun Seoul, KR 47 190
Kwak, Chan Yongin-si, KR 104 396
Lee, Jongmin Hwaseong-si, KR 187 725
Roh, Jong Wook Anyang-si, KR 20 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00