FPC flattening jig and FPC flattening method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10575409
APP PUB NO 20170094807A1
SERIAL NO

15168797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A FPC flattening jig and a FPC flattening method. The FPC flattening jig includes a pressurization mechanism and a heating mechanism; a bottom of the pressurization mechanism has a planar base surface which is used to contact a warped FPC to exert pressure thereon; the heating mechanism is used to heat the pressurization mechanism, such that the planar base surface of the pressurization mechanism has a predefined temperature when exerting pressure on the FPC. The FPC flattening jig heats the pressurization mechanism by a heating mechanism, and then the heated planar base surface of the pressurization mechanism contacts the warped FPC and exerts pressure thereon. Therefore, the FPC can be flattened. As such, the FPC can be reused, facilitating the improvement on the recycling rate of FPC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTDBEIJING 100015
HEFEI BOE OPTOELECTRONICS TECHNOLOGY CO LTDNO 2177 TONGLINGBEI ROAD HEFEI ANHUI 230012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hou, Yongkang Beijing, CN 4 1
Yang, Jianlei Beijing, CN 6 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00