industrial utilization hub integrated with electric power production and optional cryo-energy storage

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10577248
APP PUB NO 20170341942A1
SERIAL NO

15603670

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Lake Kivu contains ˜50 million tonnes (MT) dissolved biomethane. Efficient use is problematic from massive associated CO2: ˜600 MT. Conventional extraction scrubs CO2 with ˜50% overall CH4 loss, and returns ˜80% CO2 into the deep lake, preserving a catastrophe hazard threatening >2 M people. Methods and systems are disclosed coupling: (1) efficient CH4+CO2 degassing; (2) optional oxyfuel power generation and CO2 power cycle technologies; and (3) CO2 capture, processing, storage and use in a utilization hub. The invention optimally allows power production with >2× improved efficiency plus cryo-energy storage and large-scale greentech industrialization. CO2-utilizing products can include: Mg-cements/building materials, algal products/biofuels, urea, bioplastics and recycled materials, plus CO2 for greenhouse agriculture, CO2-EOR/CCS, off-grid cooling, fumigants, solvents, carbonation, packaging, ores-, biomass-, and agro-processing, cold pasteurization, frack and geothermal fluids, and inputs to produce methanol, DME, CO, syngas, formic acid, bicarbonate and other greentech chemicals, fuels, fertilizers and carbon products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HARPER BIOTECH LLC D/B/A SIMBUKA ENERGY LLC414 S ITHAN AVENUE VILLANOVA PA 19085

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harper,, Jr Charles L Villanova, US 3 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00