Apparatus, system, and method for smart roadway stud control and signaling

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10577763
APP PUB NO 20180305876A1
SERIAL NO

15962802

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The subject matter described herein includes a roadway stud control system including a local stud control system positioned along a first section of a roadway, a plurality of roadway studs, each roadway stud disposed on a surface of the first section of the roadway and communicably coupled to the local stud control system, wherein the local stud control system is configured to communicate a control signal to control at least one aspect of the plurality of roadway studs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MZC FOUNDATION, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Alan J Woodinville, US 5 87
Beaton, Allison Kelly Chattahoochee Hills, US 3 10
Buda, Marie Cambridge, GB 3 10
Churcher, Laura Cambridge, GB 3 10
Colby, Edward Cambridge, GB 15 156
Langford, A Philip LaGrange, US 3 10
Langford, Harriet Anderson LaGrange, US 3 10
Le, Faou Glenn Cambridge, GB 6 10
Milton, Andy Cambridge, GB 5 15
Picard, John Atherton, US 3 10
Salisbury, James Cambridge, GB 4 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00