Nanowires-based transparent conductors

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10580549
APP PUB NO 20180218802A1
SERIAL NO

15871949

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of fabricating a transparent conductor includes the following steps. The first step is drawing a substrate from a first reel to a second reel along a travelling path, and along the travelling path. Next step is forming a metal nanowire dispersion layer on the substrate and then drying the metal nanowire dispersion layer to form a metal nanowire network layer. Next step is forming a matrix layer on the metal nanowire network layer so as to form a conductive layer of the metal nanowire network layer embedded in the matrix layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CAMBRIOS FILM SOLUTIONS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alden, Jonathan S Mountain View, US 7 503
Dai, Haixia Mountain View, US 28 1411
Knapp, Michael R Emerald Hills, US 59 7665
Na, Shuo Sao Jose, US 18 1114
Pakbaz, Hash Hayward, US 20 1383
Pschenitzka, Florian San Francisco, US 63 1743
Quan, Xina Saratoga, US 35 1890
Spaid, Michael A Mountain View, US 35 2161
Winoto, Adrian San Francisco, US 33 1143
Wolk, Jeffrey Half Moon Bay, US 20 1057

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00