Conductor path structure having a component received in a vibration-damped manner

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10582610
APP PUB NO 20180263112A1
SERIAL NO

15976128

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conductor path structure has a damping device for an oscillation-damped and/or vibration-damped (electronic, electromechanical, micromechanical) component. The conductor path structure has a first base body made of a carrier material including a connection area for receiving the component. The connection area is arranged separated from an area of the first base body surrounding it and is arranged oscillation-damped and/or vibration damped and co-acting with an intrinsic damping device of the conductor path structure. The conductor path structure includes a second base body arranged at a distance under the first base body, wherein above the second base body of the conductor path structure at least one adhesive layer of a damping material is provided. The intrinsic damping device is formed by said at least one adhesive layer arranged between the connection area of the first base body and the area of the second base body arranged below the connection area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • POSSEHL ELECTRONICS DEUTSCHLAND GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurzeja, Dietmar Niefern, DE 6 20
Morgenthaler, Frédéric Niefern, DE 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00