Double-staged oxy-fuel burner

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10584051
APP PUB NO 20180237323A1
SERIAL NO

15865911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An oxy-fuel burner including a central burner element having a central conduit terminating in a central nozzle and an annular conduit terminating in an annular nozzle surrounding the central conduit, the central conduit flowing a first reactant and the annular conduit flowing a second reactant; a first staging conduit spaced apart from a side of the central burner element and terminating in a first staging nozzle; a second staging conduit spaced apart from an opposite side the central burner element and terminating in a second staging nozzle; a first mechanism to apportion a flow of the second reactant into a non-zero primary flow of the second reactant directed to the annular conduit and a non-zero secondary flow of the second reactant; and a second mechanism to selectively apportion the secondary flow of the second reactant between the staging conduits; wherein one reactant is fuel and the other reactant is oxygen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIR PRODUCTS AND CHEMICALS INC1940 AIR PRODUCTS BOULEVARD PATENT DEPT ALLENTOWN PA 18106-5500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buzinski, Michael David Slatington, US 12 61
D'Agostini, Mark Daniel Allentown, US 45 417
Horan, William J Bear Creek Township, US 5 30
Slavejkov, Aleksandar Georgi Allentown, US 35 432

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 10, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 10, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00