Rotor and reluctance motor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10587159
APP PUB NO 20190207441A1
SERIAL NO

16298095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a rotor includes a shaft and a rotor core. A plurality of flux barriers are formed at the rotor core. The flux barrier has a plurality of bridges, and one or more barrier regions. When a width of the bridge of a first flux barrier is defined as wa, a width of the bridge of a second flux barrier is defined as wb, a value obtained by dividing a radius of a smallest circle that is tangent to a central line of the first flux barrier by an outer radius of the rotor core is defined as a, and a value obtained by dividing a radius of a smallest circle that is tangent to a central line of the second flux barrier by the outer radius of the rotor core is defined as b, and when f(x)=(1−x{circumflex over ( )}2){circumflex over ( )}(3/2) and g(x)=(1−x{circumflex over ( )}3), a relationship of f(b)/f(a)≤wb/wa≤g(b)/g(a) is satisfied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA; TOSHIBA INFRASTRUCTURE SYSTEMS & SOLUTIONS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasebe, Toshio Hachioji, JP 20 85
Matsushita, Makoto Fuchu, JP 98 521
Misu, Daisuke Tama, JP 31 137
Takahashi, Norio Yokohama, JP 143 1932
Takeuchi, Katsutoku Kokubunji, JP 16 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 10, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 10, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00