Pyrolysis system for bio-oil component extraction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10589187
APP PUB NO 20140352204A1
SERIAL NO

13907494

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system is described that includes a pyrolyzer and a primary condenser. The primary condenser is coupled to the pyrolyzer and includes an input to receive pyrolytic vapors from the pyrolyzer and a solvent. The condenser is further configured to condense the pyrolytic vapors by contacting the pyrolytic vapors with the solvent to form a condensed liquid that exits the primary condenser via an output. A capture vessel receives the condensed liquid from the condenser output. A recirculator couples the capture vessel to the primary condenser input and is configured to receive the condensed liquid from the primary condenser, and to provide at least a portion of the condensed liquid as the solvent in the primary condenser. The solvent from the bio-oil component/solvent mixture is then extracted in a solvent extraction system and returned to the quenching system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOLERO ENERGY LLC1330 21ST STREET SUITE 200 SACRAMENTO CA 95811

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bélanger, Raymond Chilliwack, CA 2 11
Churchill, Christopher Sacramento, US 8 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00