One-way storage basin valve

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10591085
SERIAL NO

15672400

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A one-way valve is provided. The one-way valve includes a base having a first ring wall including a first aperture disposed therethrough. The base further includes a second ring wall coaxial with the first ring wall. The second ring wall includes a second aperture disposed therethrough and angularly offset from the first aperture. The base further includes a central arching surface. The one-way valve includes a diaphragm disposed on the central arching surface. The one-way valve further includes a cover secured to the base and defining an annular skirt region. The one-way valve further includes a seal disposed in the annular skirt region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLCFAIRLANE PLAZA SOUTH SUITE 800 330 TOWN CENTER DRIVE DEARBORN MI 48126

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bartz, Robert Joseph Detroit, US 3 6
Hughes, Douglas G South Lyon, US 3 5
Kaldobsky, Tyler James-Ray Westland, US 12 3
Lammers, Bradley Arnold Canton, US 4 8
Sureshkumar, Ahthavan Raja LaSalle, CA 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00