Substrate processing apparatus and substrate processing method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10591820
SERIAL NO

16073881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resist film including a metallic component and a photosensitive material is formed on a surface of a substrate, and then a peripheral portion of the resist film on the substrate is irradiated with light by an edge exposer. Subsequently, development processing is performed with a development liquid from a nozzle on the exposed portion of the resist film. Thus, the part of the resist film formed on the peripheral portion of the substrate is removed. Thereafter, exposure processing is performed on the substrate in an exposure device, so that an exposure pattern is formed on the resist film. Then, a development liquid is supplied to the exposed substrate in a development processing unit, so that development processing is performed on the resist film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCREEN HOLDINGS CO LTDTENJINKITA-MACHI 1-1 TERANOUCHI-AGARU 4-CHOME HORIKAWA-DORI KAMIGYO-KU KYOTO-SHI KYOTO 602-8585

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asai, Masaya Kyoto, JP 21 56
Harumoto, Masahiko Kyoto, JP 44 328
Kaneyama, Koji Kyoto, JP 69 700
Tanaka, Yuji Kyoto, JP 302 2044

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00