Multiple location load control system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10593373
SERIAL NO

16179317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load control device may include a semiconductor switch, a control circuit, and first and second terminals adapted to be coupled to a remote device. The load control device may include a first switching circuit coupled to the second terminal, and a second switching circuit coupled between the first terminal and the second terminal. The control circuit may be configured to render the first switching circuit conductive to conduct a charging current from an AC power source to a power supply of the remote device during a first time period of a half-cycle of the AC power source, and further configured to render the first and second switching circuits conductive and non-conductive to communicate with the remote device via the second terminal during a second time period of the half-cycle of the AC power source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUTRON TECHNOLOGY COMPANY LLC7200 SUTER ROAD COOPERSBURG PA 18036

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lenz, Jonathan T Emmaus, US 26 491
Raneri, Daniel Curtis Orefield, US 70 1881
Shukla, Jaykrishna A Mays Landing, US 51 501
Weightman, Russell Abington, US 20 495

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00