Magnetoresistance effect device and magnetoresistance effect module

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10593459
SERIAL NO

16306935

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A magnetoresistance effect device includes: a first magnetoresistance effect element including a first ferromagnetic layer, a second ferromagnetic layer, and a first spacer layer, a metal layer, a first electrode, an input terminal, an output terminal, and a reference potential terminal, wherein the first ferromagnetic layer, the first spacer layer, the second ferromagnetic layer, and the first electrode are disposed in this order, the second ferromagnetic layer is in electrical contact with the first electrode, which is connected to the output terminal configured to output a high-frequency signal, the metal layer is connected to the input and reference potential terminals so that a high-frequency signal flowing from the input terminal to the metal layer flows to the reference potential terminal, which is in electrical contact with the first ferromagnetic layer, and the first magnetoresistance effect element has an application terminal configured to apply a DC current or a DC voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 501 TDK CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Suzuki, Tsuyoshi Tokyo, JP 112 1016

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00