Material separators

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10596599
APP PUB NO 20190337017A1
SERIAL NO

16515156

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure features material separators for screening excavated material (e.g., rocks from soil.) In some implementations the materials separators include (a) a supporting frame; (b) a screening surface mounted at an incline on the supporting frame, the screening surface comprising a plurality of fixed bars that are attached to the frame in a manner to resist upward movement, and a plurality of shift bars that are attached to the frame at their upper and lower ends, in a manner to allow upward movement; and (c) a shift bar actuator, positioned between the upper and lower ends of the shift bars, the shift bar actuator being configured to impart a two-stage movement to the shift bars, whereby during a first stage the upper ends are first displaced vertically, and during a second stage the lower ends pivot upward about the upper ends.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Snow, Michael David Bend, US 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00