Pump and a desalination system including the pump

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10598162
APP PUB NO 20180112653A1
SERIAL NO

15298257

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pump in desalination systems has four cylinders, each having a double acting piston. Each cylinder and piston defines a feed chamber and a recovery chamber. The pistons connect to a common drive. The connection to the common drive is such that the pistons reciprocate in a sequence equally spaced in time. Reciprocating valving for each piston is driven by the common drive to be 90 degrees out of phase with the respective piston. The valving connects the recovery chamber alternately to an inlet manifold for an intake stroke of the piston relative to the recovery chamber, and to an outlet manifold for a discharge stroke of the piston relative to the recovery chamber. A brief period of closure coincides with top dead centre and bottom dead centre of the piston, during which the recovery chamber is blocked off from both the inlet and outlet manifolds. The reciprocating valving is midway between its top dead centre and bottom dead centre during the period of closure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KATADYN DESALINATION, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dent, Christopher John Riverhead, NZ 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00