Adaptable pole for a pool device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10603779
APP PUB NO 20180015606A1
SERIAL NO

15645830

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular pole includes a first tube having a first end and a second end, the second end defining a first through-hole oriented perpendicular to an axis of the first tube. The modular pole further includes a second tube having a first end and a second end, the first end defining a second through-hole oriented perpendicular to an axis of the second tube, and the second end including a device connector for connecting the second tube to the pool device. The modular pole further includes a first tube connector designed to be positioned within the first tube and the second tube and having a first retractable protrusion designed to extend through the first through-hole when the first tube connector is positioned within the first tube and a second retractable protrusion designed to extend through the second through-hole when the first tube connector is positioned within the second tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurani, Hemant Chandrakant Riverside, US 3 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00