Shear retort for ablative pyrolysis

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10604704
APP PUB NO 20190338193A1
SERIAL NO

15972657

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shear retort mill for slow ablative pyrolysis features friction heating between shearing surfaces on a rotating disk and a static or rotating cylindrical drum enclosing the disk. A feed enters the workspace between the rotating disk and the bottom of the drum through a hollow feed shaft coupled to the rotating disk. Preferably, an auger compacts and moves the feed downward, and a shredder reduces the feed's particle size. The feed is increasingly ground and pyrolyzed as it is forced between the drum and disk shearing surface. As the dense processed material extrudes at the edge of the workspace, the gases and liquid products are forced inward by the barrier of dense solids. A static exhaust pipe at the center of the rotating feed shaft allows for the exit of these gases, which preferably go to a heat exchanger to recover any condensable fractions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VORSANA INC11602 NE 192ND AVENUE BRUSH PRAIRIE WA 98606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McCutchen, David J Portland, US 18 264

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00