Combined system for producing steel and method for operating the combined system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10604816
APP PUB NO 20160304978A1
SERIAL NO

15102142

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a plant complex for steel production comprising a blast furnace for producing pig iron, a converter steel mill for producing crude steel and a gas-conducting system for gases that occur in the production of pig iron and/or in the production of crude steel. According to the invention, the plant complex additionally has a chemical or biotechnological plant connected to the gas-conducting system and a plant for producing hydrogen. The plant for producing hydrogen is connected to the gas-conducting system by a hydrogen-carrying line. Also the subject of the invention is a method for operating the plant complex.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THYSSENKRUPP AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Achatz, Reinhold Essen, DE 7 8
Kleinschmidt, Ralph Mülheim a.d.Ruhr, DE 7 24
Krüger, Matthias Patrick Herne, DE 5 6
Krotov, Denis Dortmund, DE 6 4
Oles, Markus Hattingen, DE 48 1102
Schmöle, Peter Dortmund, DE 6 8
von, Morstein Olaf Essen, DE 13 60
Wagner, Jens Frankfurt a.M., DE 48 182

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00