Load bearing harness

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10605574
APP PUB NO 20190038007A1
SERIAL NO

16051851

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Load carriage systems are described including one or more of a first chest panel, a first back panel, and a self-adjusting cummerbund connecting the first chest panel and the first back panel. The self-adjusting cummerbund may include a tensioning mechanism configured to allow the cummerbund to extend and retract, and may be configured to provide varying resistive force. The tensioning mechanism may include one or more of a sliding portion, a continuous patterned length of material that is folded over itself, and an elastic member that is attached to the sliding member and the length of material. Body armor plates may be held between outer and inner chest panels and/or between outer and inner back panels. A strip of webbing may be used to secure the body armor plate between the outer and inner panels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • S&S PRECISION, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Borland, Andrew C Virginia Beach, US 35 364
Elizalde, William-Joseph Basan Virginia Beach, US 27 231
Swan, Johnny E Virginia Beach, US 39 465
Van, Reesema Willem J Virginia Beach, US 3 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00