Off-road vehicle and ground management system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10607091
APP PUB NO 20180314900A1
SERIAL NO

15835619

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An off-road vehicle that travels on the off-road ground includes: a sensor group configured to detect unevenness of the ground; a camera configured to capture the unevenness of the ground; a ground unevenness degree calculation unit configured to calculate a ground unevenness degree indicating an unevenness degree of the ground based on an input parameter; an input parameter setting unit configured to set, as the input parameter, data selected from among data detected by the sensor group and image data captured by the camera; an unevenness-position data generation unit configured to associate the actual vehicle position with the ground unevenness degree to generate ground unevenness-position data; and a data storage unit configured to store the ground unevenness-position data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KUBOTA CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Yuji Sakai, JP 56 248
Kawamoto, Kazuyoshi Sakai, JP 6 37
Tominaga, Akira Sakai, JP 65 653

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00