Power management utilizing synchronous common coupling

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10608545
APP PUB NO 20180198377A1
SERIAL NO

15915604

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses, systems, and methods for managing power utilizing synchronous common coupling. An apparatus comprises a synchronous common coupling, a plurality of ports, and a plurality of stacks connected through the synchronous common coupling. Each stack comprises at least one stage, with each stage comprising at least one source/load bridge, at least one flux bridge, and a DC bus. The at least one source/load bridge of one stage of each stack is connected to a source or load through one of the plurality of ports, the at least one flux bridge of each stage is connected to an electrically isolated winding in the synchronous common coupling, and the at least one flux bridge of each stage is connected to the at least one source/load bridge of the stage through the DC bus. The synchronous common coupling is configured to exchange power between each of the plurality of stacks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESILIENT POWER SYSTEMS LLC4500 WILLIAMS DRIVE SUITE 212-193 GEORGETOWN TX 78633

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Esser, Albert Andreas Maria Austin, US 16 858
Keister, Joshua David Georgetown, US 5 77
Keister, Lyle Thomas Georgetown, US 9 159
Schafer, Bradley John Fayetteville, US 7 110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00