Salt management system for portable renewable energy microgeneration system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10611655
APP PUB NO 20190210902A1
SERIAL NO

16220490

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A renewable energy microgeneration apparatus is disclosed that includes a mixing tank that mixes waste with a liquid, a buffer tank that receives and pre-warms the mixed waste, a pasteurization tank that pasteurizes on the pre-warmed mixed waste, a digestion tank that performs anaerobic digestion on the pasteurized waste, a de-watering device that separates liquid digestate and removes salt from the liquid, sensors that measure salinity and biogas quality, and a controller. The controller causes the transfer of digestate from the digestion tank to the pasteurization tank to the dewatering device, causes the de-watering device to separate the liquid and remove the salt from the liquid, monitors the salinity of the liquid and the quality of biogas using the sensors, and causes the mixing of the liquid with the waste and adjusts the feed rate of the waste to reduce the salinity of the waste and increase methane production.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEAB POWER LIMITED41 LUKE STREET LONDON EC2A 4DP

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sassow, Nicolas W Ringwood, GB 10 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00