Process for producing magnesium metal by dehydrating dihydrate magnesium chloride

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10617995
APP PUB NO 20170368500A1
SERIAL NO

15533785

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present description relates to a process for producing magnesium metal from dihydrate magnesium chloride comprising the steps of dehydrating MgCI2.2H2O with anhydrous hydrochloric acid (HCI) to obtain anhydrous magnesium chloride in an inert environment, releasing the mixture of hydrous HCI and protection gas; and electrolyzing the anhydrous magnesium chloride in an electrolytic cell fed with hydrogen gas under free oxygen atmosphere content, wherein magnesium metal and anhydrous hydrogen chloride are produced, wherein a part of the hydrous HCI is passed through a scrubbing unit to obtain a hydrochloric acid solution, the other part of the hydrochloric chloride gas is dehydrated by contact with a desiccant agent in a drying unit to produce anhydrous HCI, and wherein the anhydrous HCI produced by at least one of the electrolytic cell and the drying unit is reused to dehydrate the of MgCI2.2H2O.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLIANCE MAGNÉSIUMDANVILLE QUÉBEC J0A 1A0

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fournier, Joël Carignan, CA 28 145
Gauthier, Laury St-Apollinaire, CA 9 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00