Coupling and method for fixing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10619676
APP PUB NO 20190154085A1
SERIAL NO

16165031

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coupling including a body member including a fitting hole into which an end of a spline shaft is fitted, and a connecting portion, the shaft including spline grooves linearly extending in an axial direction in a circumferential direction; a positioning mechanism positioning the body member in the circumferential direction with respect to the shaft fitted into the fitting hole; and a fixing portion fixing, to the shaft, the body member being positioned. The positioning mechanism includes a screw hole provided in the body member so as to penetrate from an outer surface of the body member to an inner surface of the fitting hole, a screw member fastened into the screw hole, and a pressing part having a circular cross section, provided in a tip of the screw member, and pressed against the spline groove by fastening of the screw member into the screw hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FANUC CORPORATIONOSHINO-MURA MINAMITSURU-GUN YAMANASHI 401-0597

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Watanabe, Kei Yamanashi, JP 165 753

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00