Permanent magnet, and motor and power generator using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10629340
APP PUB NO 20140139064A1
SERIAL NO

14076383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a permanent magnet includes: a composition expressed by RpFeqMrCusCo100-p-q-r-s (R is a rare-earth element, M is at least one element selected from Zr, Ti, and Hf, 10≤p≤13.5 at %, 25≤q≤40 at %, 1.35≤r≤1.75 at %, and 0.88≤s≤13.5 at %); and a metallic structure including Th2Zn17 crystal phases each having a Fe concentration of 25 at % or more, and Cu-rich crystal phases each having a Cu concentration of from 25 at % to 70 at %. An average thickness of the Cu-rich crystal phases is 20 nm or less, and an average distance between the Cu-rich crystal phases is 200 nm or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBAMINATO-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Endo, Masaki Tokyo, JP 51 232
Hagiwara, Masaya Kanagawa-ken, JP 68 214
Horiuchi, Yosuke Tokyo, JP 72 272
Kobayashi, Tsuyoshi Kanagawa-ken, JP 203 2224
Okamoto, Keiko Kanagawa-ken, JP 39 211
Sakurada, Shinya Tokyo, JP 135 827

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00