Method, in particular, for producing snow, and a device for performing the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10634407
APP PUB NO 20140246511A1
SERIAL NO

14348897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, in particular for generating snow from water, using a low-pressure hydraulic device having a pump unit, to which a purification system is connected, and a distribution device having at least one high-pressure pump, to which a high-pressure unit having a snow cannon and/or a different snow-generating unit is connected. In order for the bonding of the water molecules in the supermolecular water structure of the process water to change and the generation of snow to improve, according to the invention at least part of the water used is exposed to an ionization field and/or a polarization field while simultaneously being exposed to the effects of an alternating electromagnetic field so that a weaker bonding of the water molecules in the supermolecular water structure is achieved, resulting in an improvement in the absorption and transfer of heat. The invention further relates to a device for carrying out the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OKEANOS CORPORATIONSUITE 9 ANSUYA ESTATE REVOLUTION AVENUE VICTORIA MAHE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grega, Samuel Presov, SK 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00