Out-of-core nuclear instrumentation device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10650932
APP PUB NO 20180005715A1
SERIAL NO

15541724

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A detector signal-processing circuit comprises the following: a current/voltage conversion part that converts the current value of a neutron detector to a voltage value; a variable gain amplification part that performs amplification by a first-step variable gain using a D/A converter; a current level response-use resistance circuit that selects the measurement range in accordance with the voltage value; temperature measurement units for measuring the temperature of the resistance circuit for current level response; a temperature compensation part for commanding gain compensation by the D/A converter on the basis of the measured temperature; and a selective adjustment control part for selective control of the measurement range and adjustment of the variable gain of the variable gain amplification part. Due to this configuration, neutron flux can be measured with high precision while maintaining a constant output precision, before and after switching of the measurement range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONCHIYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aiba, Toshihide Tokyo, JP 9 8
Nakai, Toshimitsu Tokyo, JP 7 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00