Power supply system and railroad car

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10668811
APP PUB NO 20190031029A1
SERIAL NO

16073672

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply system (120) according to an embodiment of the present invention includes a first power supply device (121), a second power supply device (122), and an addition circuit (123). The first power supply device (121) includes a first driving circuit that outputs a first direct current from a first power supply input and a first control circuit that controls the first driving circuit. The second power supply device (122) includes a second driving circuit that outputs a second direct current from a second power supply input and a second control circuit that monitors the first driving circuit and controls the second driving circuit. The addition circuit (123) is connected to an output terminal of each of the first and second power supply devices (121, 122) and outputs a third direct current that is a value obtained by adding the first and second direct currents to a load device (on-board illumination device (110)).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOITO ELECTRIC INDUSTRIES LTDSHIZUOKA SHIZUOKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Izumi, Takayuki Shizuoka, JP 19 122
Maruyama, Kazuo Shizuoka, JP 43 431
Matsunaga, Jun Shizuoka, JP 5 20
Samejima, Akitaka Shizuoka, JP 3 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00