Cooling module, supercritical fluid power generation system including the same, and supercritical fluid supply method using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10690014
APP PUB NO 20180328237A1
SERIAL NO

15945748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling module is included in a supercritical fluid power generation system and is used in supercritical fluid supply method. The cooling module includes a cooling source flow unit in which a cooling source supplied from an outside flows, a cooler unit, and a buffer unit. The cooler unit enables a gas-phase working fluid introduced through a working fluid inlet port to undergo a phase change into a liquid-phase working fluid by performing heat exchange with the cooling source flowing in the cooling source flow unit. The buffer unit is provided under the cooler unit and receives and stores the liquid-phase working fluid cooled by the cooler unit. The stored liquid-phase working fluid is supplied to an outside fluid pump. Consequently, stable supply of the working fluid is achieved by the supercritical fluid power generation system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTDSEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cha, Songhun Osan-si, KR 6 6
Jang, Juntae Seoul, KR 2 3
Kim, Sanghyeun Yongin-si, KR 4 5
Lee, Gonjoo Seongnam-si, KR 1 0
Sung, Hwachang Seoul, KR 5 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00